Upgrading bd
How to upgrade bd and keep your projects in sync.
Checking for Updates
# Current version
bd version
# What's new in recent versions
bd info --whats-new
bd info --whats-new --json # Machine-readable
Upgrading
Use the command that matches your install method.
| Install method | Platforms | Command |
|---|---|---|
| Quick install script | macOS, Linux, FreeBSD | curl -fsSL https://raw.githubusercontent.com/gastownhall/beads/main/scripts/install.sh | bash |
| PowerShell installer | Windows | irm https://raw.githubusercontent.com/gastownhall/beads/main/install.ps1 | iex |
| Homebrew | macOS, Linux | brew upgrade beads |
| go install (server-mode only) | macOS, Linux, FreeBSD, Windows | CGO_ENABLED=0 go install github.com/steveyegge/beads/cmd/bd@latest |
| go install (embedded-capable) | macOS, Linux, Windows | CGO_ENABLED=1 GOFLAGS=-tags=gms_pure_go go install github.com/steveyegge/beads/cmd/bd@latest |
| npm | macOS, Linux, Windows | npm update -g @beads/bd |
| bun | macOS, Linux, Windows | bun install -g --trust @beads/bd |
| From source (Unix shell) | macOS, Linux, FreeBSD | git pull && make build |
Quick install script (macOS/Linux/FreeBSD)
curl -fsSL https://raw.githubusercontent.com/gastownhall/beads/main/scripts/install.sh | bash
PowerShell installer (Windows)
irm https://raw.githubusercontent.com/gastownhall/beads/main/install.ps1 | iex
Homebrew
brew upgrade beads
If you still have the old tap formula installed as bd, switch to the
Homebrew core formula:
brew uninstall bd
brew untap gastownhall/beads 2>/dev/null || true
brew untap steveyegge/beads 2>/dev/null || true
brew install beads
go install
# Server-mode only
CGO_ENABLED=0 go install github.com/steveyegge/beads/cmd/bd@latest
# Embedded-capable
CGO_ENABLED=1 GOFLAGS=-tags=gms_pure_go go install github.com/steveyegge/beads/cmd/bd@latest
From Source
cd beads
git pull
make build
sudo mv bd /usr/local/bin/
After Upgrading
Important: After upgrading, update your hooks:
# 1. Check what changed
bd info --whats-new
# 2. Update git hooks to match new version
bd hooks install
# 3. Check for any outdated hooks
bd info # Shows warnings if hooks are outdated
# 4. If using Dolt backend, restart the server
bd dolt stop && bd dolt start
Why update hooks? Git hooks are versioned with bd. Outdated hooks may miss export refresh, legacy fallback, or safety fixes.
Database Migrations
After major upgrades, check for database migrations:
# Inspect migration plan (AI agents)
bd migrate --inspect --json
# Preview migration changes
bd migrate --dry-run
# Apply migrations
bd migrate
# Migrate and clean up old files
bd migrate --cleanup --yes
Remote-backed databases and multiple clones
bd refuses to silently apply pending schema migrations to a database that has
a Dolt remote configured. Migrating more than one clone of a shared remote
independently forks the schema, after which bd dolt pull can no longer merge —
the break is silent and, across a primary-key-reshaping migration, unrecoverable
(#4259). The supported flow
is: one machine migrates and publishes; every other clone re-clones the migrated
database.
This applies to every upgrade that crosses a pending migration on a remote-backed database — the same procedure whether you are moving to a prerelease or to a stable release.
The gate is state-aware by default
(#4516): before blocking,
bd consults the remote's cached schema state and
- auto-migrates when the remote is at the same schema version as this
clone — no one has migrated yet, so this clone is a safe first-mover
(concurrent first-movers converge to identical tables). It reminds you to
bd dolt pushafterwards. - stops and directs you to adopt (
bd bootstrap) when the remote has already been migrated by another clone. - stops for a human decision when this clone and the remote applied different content for the same migration (a genuine fork), or when the remote's schema state cannot be read from the cached ref.
Set BD_SMART_GATE=0 to opt out and make the gate block unconditionally.
The recipes below are the explicit path and work the same in either mode.
Important ordering: once the new binary is installed, a database with
pending migrations is gated on every open — bd dolt push and bd dolt pull are refused too, not just bd migrate. So do all syncing with your
current binary, before you install the new one.
Back up before you migrate. Schema migrations assume the database matches the shape the previous migrations left behind; real databases sometimes drift (interrupted writes, tooling bugs, very old bootstraps). A JSONL export is cheap, issue-complete, and importable by any bd version:
bd export --all -o .beads/backup/pre-migrate-$(date +%Y%m%d).jsonl
bd export captures issues, not Dolt history or config — for a full snapshot
also copy the .beads directory (or dolt backup in server mode) while no
bd command is running.
Single clone (including a solo user with a remote):
bd dolt push # 1. CURRENT binary: publish all local work
bd export --all -o .beads/backup/pre-migrate.jsonl # 2. backup (see above)
# 3. install the new binary (see Upgrading above)
BD_ALLOW_REMOTE_MIGRATE=1 bd migrate # 4. migrate as the designated migrator
bd dolt push # 5. publish the migrated schema
bd version # 6. confirm the new version is active
Multiple clones sharing one remote:
# 1. With your CURRENT (old) binary, on EVERY clone: publish all work and get in
# sync, then stop editing until the upgrade is done.
bd dolt push
bd dolt pull
# 2. Designated migrator ONLY: back up, install the new binary, then migrate
# and publish.
bd export --all -o .beads/backup/pre-migrate.jsonl
BD_ALLOW_REMOTE_MIGRATE=1 bd migrate
bd dolt push
# 3. Every OTHER clone: install the new binary, then ADOPT the migrated database.
# (bd dolt pull is refused here — the clone still has pending migrations — so
# re-clone instead. Safe because step 1 already pushed all work.)
bd bootstrap
bd bootstrap replaces the local database, so any work not pushed in step 1 is
lost — that is why step 1 publishes everything first. If a clone was instead
migrated independently and bd dolt pull later fails with cannot merge because table dependencies has different primary keys in its common ancestor, the
schema has already forked — follow the recovery playbook:
RECOVERY.md#pk-fork-refused.
In server mode, bd doctor adds a migration-content-skew check that flags a
forked schema against the cached remote ref — a useful post-upgrade
verification. It is not available in embedded mode; there, confirm the upgrade
with bd version and a normal read such as bd ready.
Cross-era Upgrades
If you're upgrading from a much older version of bd, your project may use a different storage backend. bd has gone through several storage eras:
| Era | Versions | Storage |
|---|---|---|
| SQLite | v0.30–v0.50 | .beads/beads.db |
| Dolt server | v0.50–v0.58 | .beads/dolt/ (external server) |
| Embedded Dolt (old) | v0.59–v0.63.2 | .beads/dolt/ (in-process) |
| Embedded Dolt (current) | v0.63.3+ | .beads/embeddeddolt/ |
From v0.63.3+ (current era)
Upgrade the binary and run:
bd migrate
If the project was initialized before bd init automatically wired git origin
as the Dolt remote, verify the remote after upgrading:
bd dolt remote list
When the list is empty, fix it on the machine whose local database is authoritative:
bd export -o .beads/issues.pre-remote.jsonl # optional issue audit export
bd dolt remote add origin git+ssh://git@github.com/org/repo.git
bd dolt push
Commit the resulting .beads/config.yaml change so other clones can run
bd bootstrap or bd dolt pull.
From v0.59–v0.63.2 (old embedded)
Direct upgrade works automatically:
# Just use the new binary — it handles the conversion
bd list
From v0.50–v0.58 (Dolt server era)
The old binary used an external Dolt SQL server. The new binary uses an embedded engine.
# 1. Export your data while the old binary still works
bd list --json -n 0 --all > .beads/issues.jsonl
# 2. Stop the Dolt server
dolt sql-server --stop # or kill the process
# 3. Remove stale server metadata and old storage directories
rm -f .beads/metadata.json .beads/config.json
rm -rf .beads/dolt .beads/embeddeddolt
# 4. Initialize with the new binary
bd init --from-jsonl --quiet
# 5. Verify
bd list --all
From v0.30–v0.50 (SQLite era)
The old binary stored data in SQLite. The new binary uses Dolt.
Recommended: use the migration script (requires sqlite3 and jq):
# Download the script from the beads repo
curl -fsSLO https://raw.githubusercontent.com/gastownhall/beads/main/scripts/migrate-sqlite-to-current.sh
chmod +x migrate-sqlite-to-current.sh
# Run it in your project directory
./migrate-sqlite-to-current.sh
The script exports issues, dependencies, and labels from SQLite, handles type normalization, and imports everything into the new Dolt backend.
Alternative: manual export with the old binary. Old binaries are always available on GitHub Releases. Download the version that matches your project, then:
# 1. Export with the old binary
./bd-old list --json -n 0 --all > .beads/issues.jsonl
# 2. Import with the current binary
bd init --from-jsonl --quiet
# 3. Verify
bd list --all
Note: The manual export preserves issue content but not dependencies or labels. Use the migration script for a more complete transfer.
Troubleshooting Upgrades
Hooks out of date
bd hooks install
Database schema changed
bd migrate --dry-run
bd migrate
Recovery after upgrade
If you need to restore from a backup:
bd init
bd backup restore [path] --force
Or pull from a Dolt remote:
bd dolt pull